Completed projects monitoring and documenting
The construction of shopping centres, universities, manufacturing facilities, rail, roads and bridges.
4 day | 2 - 18 month | 3 year projects
Please wait while the video loads to where you left off.
A short mix between a weekend occupation and long-term fixed camera.
Through rain, dust and bug infestation the long-term camera survived. Two days of big lifts in the sunshine. Original soundtrack.
Watch the Queens tram being wrapped and then running down Swanston Street Melbourne.
One long term fixed time lapse camera - One new roof - One great soundtrack - One new advance manufacturing precinct.
The RMIT University Bundoora campus has been transformed with the introduction of a sustainably designed, state-of-the-art lecture theatre that will serve both RMIT and the general community.
Time lapse photography of fire affected region in Healesville National Park. Monitoring and hourly image data delivery of progress of forest regrowth, used in conjunction with analysis of moisture evaporation.
A rail bridge that was built onsite and moved over a number of hours into position. This job had it all, large earth moving machinery, a massive crane and rail plant. // Custom Soundtrack //
Big earth works, cranes and train track renewal shot over one weekend. // Custom Soundtrack //
Take a look through the spectacular beaches, waterfalls, forests and drive down the Great Ocean Road. One of our favourite projects for 2011.
Melbourne CBD tram track renewal over the Easter break 2011. More machinery, more workers and more late nights.
One weekend of filming power. Three lifts and a rail track renewal. Cranes, heavy machinery at all hours of the day and a custom soundtrack. We enjoyed this project!
Two new super stops for St. Kilda Road Melbourne and track renewal works. Almost one months worth of filming and an original soundtrack. An inner city project with high impact.
A documentary of the decommissioning of the old pedestrian bridge, and the installation a new pedestrian bridge and forecourt works. Three major lifts, concreting, night works, the lighting of the bridge and a custom soundtrack.
The birth of a new train station. A long-term camera installation mixed with big lifts, concreting through the night and line marking. What a great project!
An eleven month time lapse installation
The last bridge to be constructed for the completion of the Wodonga bypass. A four day night-shoot capturing the installation of 16 concrete bridge sections. Heat,rain, bugs and big lifts were the main themes.
Shot over two weekends and with a long-term camera installed for 5 months the team captured the landmark green brain. The installation of these irregular pieces was incredible to watch.
Our 2009 Megamix - Turn up the volume and feel the future.
Our favourite lifts, moves and construction projects. Filmed on location with music specifically composed for for this edit. They built it - we filmed it.